Amazon cover image
Image from Amazon.com

Estimating construction costs and schedules: [electronic resource] experience with power generation projects in developing countries / Robert W. Bacon, John E. Besant-Jones, and Jamshid Heidarian.

By: Contributor(s): Series: World Bank e-Library | World Bank technical paper. Energy series. | World Bank technical paper ; no.325.Publication details: Washington, D.C. : World Bank, c1996.Description: xv, 120 p. : ill. ; 28 cmISBN:
  • 0821336703
Subject(s): Additional physical formats: Print Version:DDC classification:
  • 621.31/21 20
LOC classification:
  • TK1193.D44 B33 1996
Online resources:
Reviews from LibraryThing.com:
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings: http://elibrary.worldbank.org/content/book/9780821336700

Includes bibliographical references (p. 119-120).

Description based on print version record.

There are no comments on this title.

to post a comment.

© Strathmore University Library
Madaraka Estate, Ole Sangale Road | P. O. Box 59857 - 00200 City Square, Nairobi, Kenya
(+254) (0)703 034 000/200/300 | (+254) (0)20-607498